Measures for mitigating the delay in high-rise building construction projects in Dubai
Construction industry faces several challenges such as low labour productivity, cost overrun, time overrun, and extreme weather condition. Globally, the most severe challenge is project delay, particularly in Dubai where the construction industry is booming rapidly than other parts of the world, esp...
Saved in:
主要作者: | Bhatti, Imtiaz Ali |
---|---|
格式: | Thesis |
语言: | English English English |
出版: |
2019
|
主题: | |
在线阅读: | http://eprints.uthm.edu.my/519/1/24p%20IMTIAZ%20ALI%20BHATTI.pdf http://eprints.uthm.edu.my/519/2/IMTIAZ%20ALI%20BHATTI%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/519/3/IMTIAZ%20ALI%20BHATTI%20WATERMARK.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Lateral stability of high-rise building
由: Gan, Ming Ong
出版: (2005) -
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
由: Ullah, Kaleem
出版: (2018) -
The delay for high rise building in Malaysia /
由: Zarith Naquiah Zahari
出版: (2017) -
Recovery plan strategy on the delay construction project
由: Ku Ismail, Ku Adenan
出版: (2004) -
Strategies for managing delay in Mara's building construction
由: Sulaiman, Khairunnizam
出版: (2010)