Profiling of extension of time cases in Malaysian construction projects
In the construction industry, disputes commonly happen because of the elements of competitive nature, complexity, and comprehensive contractual requirements of the construction projects. Delay and over costing are widespread occurrences in the construction industry. The nature of construction delays...
Saved in:
Main Author: | Abdul Latif, Abdul Hafiz |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2022
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/100277/1/AbdulHafizMBE2022.PDF |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Profiling of valid available grounds to claim extension of time in construction industry
by: Lam, Tian Sui
Published: (2020) -
Best endeavours' for granting extension of time in construction contract
by: Rasid, Nur Farah Farhana
Published: (2012) -
'Best endeavours' for granting extension of time in construction contract
by: Rasid, Nur Farah Farhana
Published: (2012) -
Problems associated with evaluation of extension of time (EOT) claim in government projects
by: Mat Isa, Siti Aisah
Published: (2014) -
Profile of set-off cases in Malaysian construction industry
by: Loo, Shih Nie @ Nancy Loo
Published: (2012)