Profiling of extension of time cases in Malaysian construction projects
In the construction industry, disputes commonly happen because of the elements of competitive nature, complexity, and comprehensive contractual requirements of the construction projects. Delay and over costing are widespread occurrences in the construction industry. The nature of construction delays...
Saved in:
主要作者: | Abdul Latif, Abdul Hafiz |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2022
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/100277/1/AbdulHafizMBE2022.PDF |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Profiling of valid available grounds to claim extension of time in construction industry
由: Lam, Tian Sui
出版: (2020) -
Best endeavours' for granting extension of time in construction contract
由: Rasid, Nur Farah Farhana
出版: (2012) -
'Best endeavours' for granting extension of time in construction contract
由: Rasid, Nur Farah Farhana
出版: (2012) -
Problems associated with evaluation of extension of time (EOT) claim in government projects
由: Mat Isa, Siti Aisah
出版: (2014) -
Profile of set-off cases in Malaysian construction industry
由: Loo, Shih Nie @ Nancy Loo
出版: (2012)