Development of drilling non-productive time reduction framework using lean six sigma methodology for buntal exploration wells
Drilling Non-Productive Time (NPT) is loss time incurred when drilling activity has to be stopped or rate of penetration is very low during a drilling operation. Drilling NPT results in drilling cost overruns and delay in drilling schedule. Presently, there are several methods which are being deploy...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2023
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/101745/1/BalasharmilaRaoMunusamySCShE2023.pdf.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|