Development of drilling non-productive time reduction framework using lean six sigma methodology for buntal exploration wells

Drilling Non-Productive Time (NPT) is loss time incurred when drilling activity has to be stopped or rate of penetration is very low during a drilling operation. Drilling NPT results in drilling cost overruns and delay in drilling schedule. Presently, there are several methods which are being deploy...

全面介绍

Saved in:
书目详细资料
主要作者: Munusamy, Balasharmila Rao
格式: Thesis
语言:English
出版: 2023
主题:
在线阅读:http://eprints.utm.my/id/eprint/101745/1/BalasharmilaRaoMunusamySCShE2023.pdf.pdf
标签: 添加标签
没有标签, 成为第一个标记此记录!