Simulation of industrialised building system formation for housing construction

Industrialised Building System (IBS) is a construction method that offers economisation of design, site work and materials, provides shorter construction time, saving in labour, better quality control, immunity to weather changes and the most importantly, the cost factor. It has been proven successf...

全面介紹

Saved in:
書目詳細資料
主要作者: Zainal Abidin@Md. Taib, Ahmad Razin
格式: Thesis
語言:English
出版: 2007
主題:
在線閱讀:http://eprints.utm.my/id/eprint/11242/1/AhmadRazinZainalMFKA2007.pdf
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
實物特徵
總結:Industrialised Building System (IBS) is a construction method that offers economisation of design, site work and materials, provides shorter construction time, saving in labour, better quality control, immunity to weather changes and the most importantly, the cost factor. It has been proven successful in some countries such as Finland, Denmark, Netherlands, Singapore, England and the United States (CIDB, 1998). In our country Malaysia, the shorter construction time offered by IBS may seems to be the solution for the housing demand in Malaysia. The aim of this study is to determine the process flow of housing construction that are applying Industrialized Building System (IBS) components for its main structure. For that purpose, sequence process of installation activities for construction of IBS houses has been identified. Witness 2001 simulation software has been applied to model a construction of 300 IBS houses. The most achievable completion time has been examined and at the same time optimum resources for the construction has been identified during the simulation analysis. It is hoped that the widespread understanding on the Industrialised Building System (IBS) can further help to develop and promote IBS as an innovative construction method in Malaysia.