Comparing conventional to industrialised building system construction costing : a case study of school building projects
The Malaysia construction industry is undergoing a transitional change from a project based industry to a more systematic and mechanized product based technology which is Industrialised Building system (IBS). IBS construction method can increase productivity and quality of work through the use of sy...
Saved in:
Main Author: | Abdul Aziz, Zuraidah |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/30683/5/ZuraidahAbdulAzizMFKA2012.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Quality and satisfaction of house owners for industrialised building system and conventional building system
by: Mohammad, Hairuddin
Published: (2009) -
Industrialised building system formation scheduling for public buildings
by: Tay, Allan Eng Mian
Published: (2006) -
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009) -
Implementation strategy for industrialised building system
by: Lim, Pui Chung
Published: (2006) -
Life cycle costing of industrialized building system and conventional building system
by: Ali Naji Al-Attabi, Ali Mohammed
Published: (2014)