Comparing conventional to industrialised building system construction costing : a case study of school building projects
The Malaysia construction industry is undergoing a transitional change from a project based industry to a more systematic and mechanized product based technology which is Industrialised Building system (IBS). IBS construction method can increase productivity and quality of work through the use of sy...
محفوظ في:
المؤلف الرئيسي: | Abdul Aziz, Zuraidah |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2012
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/30683/5/ZuraidahAbdulAzizMFKA2012.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Quality and satisfaction of house owners for industrialised building system and conventional building system
بواسطة: Mohammad, Hairuddin
منشور في: (2009) -
Industrialised building system formation scheduling for public buildings
بواسطة: Tay, Allan Eng Mian
منشور في: (2006) -
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
بواسطة: Zawawi, Mardhiah
منشور في: (2009) -
Implementation strategy for industrialised building system
بواسطة: Lim, Pui Chung
منشور في: (2006) -
Life cycle costing of industrialized building system and conventional building system
بواسطة: Ali Naji Al-Attabi, Ali Mohammed
منشور في: (2014)