Simulation of industrialised building system components production
The construction of IBS building starts with the production of the IBS components and the production process is the main activity concern in the IBS production plant. Having an optimum production line to manufacture the required IBS elements within targeted time and limited number of reusable steel...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2006
|
主題: | |
在線閱讀: | http://eprints.utm.my/id/eprint/3593/1/NgSoonChingMFKA2006ABS.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|