Risk model for electrical and instrumentation installation for power generation system onboard ship

Installation of electrical and instrumentation of power generation system onboard ship is not without risk. Risks exist in many stages of the installation process and may lead to system failure. For decades it has been accepted by all the installation engineers representing the shipowner, the shipya...

Full description

Saved in:
Bibliographic Details
Main Author: Alias, Mohd. Azahar
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/id/eprint/40600/5/MohdAzaharAliasMFKM2013.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!