Risk model for electrical and instrumentation installation for power generation system onboard ship

Installation of electrical and instrumentation of power generation system onboard ship is not without risk. Risks exist in many stages of the installation process and may lead to system failure. For decades it has been accepted by all the installation engineers representing the shipowner, the shipya...

全面介绍

Saved in:
书目详细资料
主要作者: Alias, Mohd. Azahar
格式: Thesis
语言:English
出版: 2013
主题:
在线阅读:http://eprints.utm.my/id/eprint/40600/5/MohdAzaharAliasMFKM2013.pdf
标签: 添加标签
没有标签, 成为第一个标记此记录!