Risk model for electrical and instrumentation installation for power generation system onboard ship
Installation of electrical and instrumentation of power generation system onboard ship is not without risk. Risks exist in many stages of the installation process and may lead to system failure. For decades it has been accepted by all the installation engineers representing the shipowner, the shipya...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2013
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/40600/5/MohdAzaharAliasMFKM2013.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|