Scheduling on transportation for industrialized building systems

Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illust...

全面介绍

Saved in:
书目详细资料
主要作者: Foong, Kok Li
格式: Thesis
语言:English
出版: 2006
主题:
在线阅读:http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf
标签: 添加标签
没有标签, 成为第一个标记此记录!