Reverse logistic for industrial building system construction project
Industrialize Building System (IBS) is a manufacturing best practice that capable to interfere to market the construction. With the right product encouragement from Malaysian government, through its policies and regulations the IBS methods can flourish. However the construction industry players in M...
محفوظ في:
المؤلف الرئيسي: | Buniya, Mohanad Kamil |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2014
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/48870/25/MohanadKamilBuniyaMFKA2014.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
بواسطة: Zawawi, Mardhiah
منشور في: (2009) -
Reviewing the project delivery systems used in Malaysia Construction Industry : focus on the conventional method and the design and build method
بواسطة: Tee, Beng Hock
منشور في: (2000) -
Comparing conventional to industrialised building system construction costing : a case study of school building projects
بواسطة: Abdul Aziz, Zuraidah
منشور في: (2012) -
The implementation of design and build procurement approach in local construction industry
بواسطة: Pang, Sheh Haur
منشور في: (2003) -
A building information modelling based on contractual framework for construction of building projects
بواسطة: Abd Jamil, Ahmad Huzaimi
منشور في: (2020)