Contractor's implied duty to warn design defects
In Malaysian construction industry, traditional procurement method is the most common method of procuring a project. In this method, the client contracts with consultants, and has another separate contract with the contractor. Consultants will prepare building designs in accordance to their expertis...
Saved in:
| 主要作者: | |
|---|---|
| 格式: | Thesis |
| 语言: | English |
| 出版: |
2015
|
| 主题: | |
| 在线阅读: | http://eprints.utm.my/id/eprint/48877/25/GilbertGanSiangMFAB2015.pdf |
| 标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
