Contractor's implied duty to warn design defects
In Malaysian construction industry, traditional procurement method is the most common method of procuring a project. In this method, the client contracts with consultants, and has another separate contract with the contractor. Consultants will prepare building designs in accordance to their expertis...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2015
|
主題: | |
在線閱讀: | http://eprints.utm.my/id/eprint/48877/25/GilbertGanSiangMFAB2015.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|