Contractor's implied duty to warn design defects
In Malaysian construction industry, traditional procurement method is the most common method of procuring a project. In this method, the client contracts with consultants, and has another separate contract with the contractor. Consultants will prepare building designs in accordance to their expertis...
Saved in:
Main Author: | Gan, Gilbert Siang Yang |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/48877/25/GilbertGanSiangMFAB2015.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Contractor's standard of duty for design in traditional contract
by: Abdullah, Mohammad Firdaus
Published: (2012) -
Employer's implied obligation in construction contract
by: Tazol Arrief, Nurulain
Published: (2013) -
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
by: Lim, Tze Shwan
Published: (2011) -
Contractor's liability to third party for defective works
by: Mohmad Zainordi, Zainab
Published: (2006)