Contractor's implied duty to warn design defects
In Malaysian construction industry, traditional procurement method is the most common method of procuring a project. In this method, the client contracts with consultants, and has another separate contract with the contractor. Consultants will prepare building designs in accordance to their expertis...
محفوظ في:
المؤلف الرئيسي: | Gan, Gilbert Siang Yang |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2015
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/48877/25/GilbertGanSiangMFAB2015.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Contractor's standard of duty for design in traditional contract
بواسطة: Abdullah, Mohammad Firdaus
منشور في: (2012) -
Employer's implied obligation in construction contract
بواسطة: Tazol Arrief, Nurulain
منشور في: (2013) -
Contractor's liability relating to defective works that are discovered after the defects liability period
بواسطة: Leong, Mei Wan
منشور في: (2010) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
بواسطة: Lim, Tze Shwan
منشور في: (2011) -
Contractor's liability to third party for defective works
بواسطة: Mohmad Zainordi, Zainab
منشور في: (2006)