Contractor's implied duty to warn design defects
In Malaysian construction industry, traditional procurement method is the most common method of procuring a project. In this method, the client contracts with consultants, and has another separate contract with the contractor. Consultants will prepare building designs in accordance to their expertis...
Saved in:
主要作者: | Gan, Gilbert Siang Yang |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2015
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/48877/25/GilbertGanSiangMFAB2015.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Contractor's standard of duty for design in traditional contract
由: Abdullah, Mohammad Firdaus
出版: (2012) -
Employer's implied obligation in construction contract
由: Tazol Arrief, Nurulain
出版: (2013) -
Contractor's liability relating to defective works that are discovered after the defects liability period
由: Leong, Mei Wan
出版: (2010) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
由: Lim, Tze Shwan
出版: (2011) -
Contractor's liability to third party for defective works
由: Mohmad Zainordi, Zainab
出版: (2006)