Contractor's implied duty to warn design defects

In Malaysian construction industry, traditional procurement method is the most common method of procuring a project. In this method, the client contracts with consultants, and has another separate contract with the contractor. Consultants will prepare building designs in accordance to their expertis...

全面介紹

Saved in:
書目詳細資料
主要作者: Gan, Gilbert Siang Yang
格式: Thesis
語言:English
出版: 2015
主題:
在線閱讀:http://eprints.utm.my/id/eprint/48877/25/GilbertGanSiangMFAB2015.pdf
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!