Implementation strategy for industrialised building system
In Malaysia, the implementation of Industrialised Building System (IBS) by using precast concrete elements were introduced since 1966 when the government launched two pilot projects in 1966 which involves the construction of Tuanku Abdul Rahman Flats in Kuala Lumpur and the Rifle Range Road Flats in...
محفوظ في:
المؤلف الرئيسي: | Lim, Pui Chung |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2006
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/5058/1/LimPuiChungMFKA2006.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
بواسطة: Zawawi, Mardhiah
منشور في: (2009) -
Industrialised building system formation scheduling for public buildings
بواسطة: Tay, Allan Eng Mian
منشور في: (2006) -
Quality and satisfaction of house owners for industrialised building system and conventional building system
بواسطة: Mohammad, Hairuddin
منشور في: (2009) -
Persepsi pemaju terhadap penggunaan IBS (Industrialised Building System)
بواسطة: Ab. Rahim, Nor Hayati
منشور في: (2009) -
Client perspective towards application of industrialised building system in private construction projetcs
بواسطة: Suraji, Norlia Sofa
منشور في: (2013)