Minimizing conflicts during construction stage by using building information modeling
Public Works Department of Malaysia (PWDM) is one of the main governments’ technical agency in Malaysia. PWDM has supervised numerous government projects but still faces problems such as delays and variations due to conflicts during construction. The main study is to investigate the effectiveness of...
Saved in:
主要作者: | Shapiai, Mohd. Faiz |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2015
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/53783/25/MohdFaizShapiaiMFKA2015.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Adoption of Building Information Modelling (BIM) tools during pre-construction stage in Malaysian construction industry
由: Mak, Tuck Kiong
出版: (2018) -
The challenges of facility manager involvement at design stage using building information modeling
由: Wong, Lydia Lee
出版: (2019) -
Noise exposure of construction workers during the earthwork stage
由: Embong, Norakmalhidayah
出版: (2020) -
Overtime in minimizing construction delay
由: Saari, Syahmi
出版: (2014) -
The implementation of building information modeling in Malaysian construction industry
由: Azmi, Nurshazriena
出版: (2019)