Minimizing conflicts during construction stage by using building information modeling
Public Works Department of Malaysia (PWDM) is one of the main governments’ technical agency in Malaysia. PWDM has supervised numerous government projects but still faces problems such as delays and variations due to conflicts during construction. The main study is to investigate the effectiveness of...
Saved in:
Main Author: | Shapiai, Mohd. Faiz |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/53783/25/MohdFaizShapiaiMFKA2015.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Adoption of Building Information Modelling (BIM) tools during pre-construction stage in Malaysian construction industry
by: Mak, Tuck Kiong
Published: (2018) -
The challenges of facility manager involvement at design stage using building information modeling
by: Wong, Lydia Lee
Published: (2019) -
Noise exposure of construction workers during the earthwork stage
by: Embong, Norakmalhidayah
Published: (2020) -
Overtime in minimizing construction delay
by: Saari, Syahmi
Published: (2014) -
The implementation of building information modeling in Malaysian construction industry
by: Azmi, Nurshazriena
Published: (2019)