Minimizing conflicts during construction stage by using building information modeling
Public Works Department of Malaysia (PWDM) is one of the main governments’ technical agency in Malaysia. PWDM has supervised numerous government projects but still faces problems such as delays and variations due to conflicts during construction. The main study is to investigate the effectiveness of...
محفوظ في:
المؤلف الرئيسي: | Shapiai, Mohd. Faiz |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2015
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/53783/25/MohdFaizShapiaiMFKA2015.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Adoption of Building Information Modelling (BIM) tools during pre-construction stage in Malaysian construction industry
بواسطة: Mak, Tuck Kiong
منشور في: (2018) -
The challenges of facility manager involvement at design stage using building information modeling
بواسطة: Wong, Lydia Lee
منشور في: (2019) -
Noise exposure of construction workers during the earthwork stage
بواسطة: Embong, Norakmalhidayah
منشور في: (2020) -
Overtime in minimizing construction delay
بواسطة: Saari, Syahmi
منشور في: (2014) -
The implementation of building information modeling in Malaysian construction industry
بواسطة: Azmi, Nurshazriena
منشور في: (2019)