Contractor’s liability under unforeseen ground conditions
Ground condition is one of the factors that determine the project successfulness. The unforeseen ground condition defined as an un-anticipated physical condition other than weather, climate, or another act of God discovered on site during the works commencement. The worse ground condition makes the...
محفوظ في:
المؤلف الرئيسي: | Permana, Assad Idea |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2015
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/77627/1/AssadIdeaPermanaMFAB20151.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Contractor's liability under clause 18.0 of PAM 2006
بواسطة: Abdul Ghani, Hafizan
منشور في: (2008) -
Contractor's liability relating to defective works that are discovered after the defects liability period
بواسطة: Leong, Mei Wan
منشور في: (2010) -
Contractor's liability as an occupier of site during construction
بواسطة: Sahibudin, Shafika
منشور في: (2009) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
بواسطة: Lim, Tze Shwan
منشور في: (2011) -
Contractor's liability to third party for defective works
بواسطة: Mohmad Zainordi, Zainab
منشور في: (2006)