Soft ground improvement by prefabricated vertical drain (pvd)

Soft soil improvement in the project requires the consideration of the preloading programme. This method long track record of success and may be a unexpected time delay. Then one of the solutions is to use surcharge that fill must extend horizontally at certain depth beyond the perimeter of the plan...

Full description

Saved in:
Bibliographic Details
Main Author: Khalid, Nor Aisah
Format: Thesis
Language:English
Published: 2018
Subjects:
Online Access:http://eprints.utm.my/id/eprint/81532/1/NorAisahKhalidMSKA2018.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!