Soft ground improvement by prefabricated vertical drain (pvd)

Soft soil improvement in the project requires the consideration of the preloading programme. This method long track record of success and may be a unexpected time delay. Then one of the solutions is to use surcharge that fill must extend horizontally at certain depth beyond the perimeter of the plan...

全面介绍

Saved in:
书目详细资料
主要作者: Khalid, Nor Aisah
格式: Thesis
语言:English
出版: 2018
主题:
在线阅读:http://eprints.utm.my/id/eprint/81532/1/NorAisahKhalidMSKA2018.pdf
标签: 添加标签
没有标签, 成为第一个标记此记录!