Enforceability of the liquidated and ascertained damages and effect of section 75 contracts ACT 1950
The usual redress awarded to the employer in the event of a breach of contract due to late completion will be in the form of liquidated damages. Liquidated damages, or commonly known as Liquidated and Ascertained Damages, abbreviated as ‘LAD’ is sought as the sequel to a non-completion of work. The...
محفوظ في:
المؤلف الرئيسي: | Mohamad, Shazlimanshah |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2019
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/92717/1/ShazlimanshahMohamadMFABU2019.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Smart contract in Malaysia Construction Industry
بواسطة: Mohamad Hidhir, Syarafina Adizah
منشور في: (2021) -
Interpretation of contracts : admissibility of pre-contractual negotiations
بواسطة: Mohamad Khairuddi, Muhammad Khawarizmi
منشور في: (2019) -
The profile of breaches of contract in construction industry
بواسطة: Zainudin, Farah Liyana
منشور في: (2019) -
Profiling of termination grounds in construction contract
بواسطة: Liew, Sock Tin
منشور في: (2018) -
Validity issues of variation order in construction contracts
بواسطة: Mazahar, Norazilan
منشور في: (2019)