Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor
Overflow risk of detention pond is defined as the probability of having a rainfall event that produces a runoff volume more than the available storage capacity of detention pond. Overflow risk analysis depends on the waiting period (elapse time) and draining time. This study dealt with risk analysis...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/9863/1/ZulizianaSuifMFKM2008.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|