Improving substructure works safety performance rating using six sigma methodology

the occupational accident rate is one of the highest across all other industrial sectors. Low safety performance can possibly contribute to occupational accident. The Solaris 1 construction project site monthly safety performance ratings were below the target 70% set by the client. This research use...

Full description

Saved in:
Bibliographic Details
Main Author: Theayavalan, Vasudevan
Format: Thesis
Language:eng
eng
eng
Published: 2022
Subjects:
Online Access:https://etd.uum.edu.my/10085/1/depositpermission-not%20allow_s823284.pdf
https://etd.uum.edu.my/10085/2/s823284_01.pdf
https://etd.uum.edu.my/10085/3/s823284_02.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!