Improving substructure works safety performance rating using six sigma methodology

the occupational accident rate is one of the highest across all other industrial sectors. Low safety performance can possibly contribute to occupational accident. The Solaris 1 construction project site monthly safety performance ratings were below the target 70% set by the client. This research use...

全面介绍

Saved in:
书目详细资料
主要作者: Theayavalan, Vasudevan
格式: Thesis
语言:eng
eng
eng
出版: 2022
主题:
在线阅读:https://etd.uum.edu.my/10085/1/depositpermission-not%20allow_s823284.pdf
https://etd.uum.edu.my/10085/2/s823284_01.pdf
https://etd.uum.edu.my/10085/3/s823284_02.pdf
标签: 添加标签
没有标签, 成为第一个标记此记录!