Improving substructure works safety performance rating using six sigma methodology

the occupational accident rate is one of the highest across all other industrial sectors. Low safety performance can possibly contribute to occupational accident. The Solaris 1 construction project site monthly safety performance ratings were below the target 70% set by the client. This research use...

全面介紹

Saved in:
書目詳細資料
主要作者: Theayavalan, Vasudevan
格式: Thesis
語言:eng
eng
eng
出版: 2022
主題:
在線閱讀:https://etd.uum.edu.my/10085/1/depositpermission-not%20allow_s823284.pdf
https://etd.uum.edu.my/10085/2/s823284_01.pdf
https://etd.uum.edu.my/10085/3/s823284_02.pdf
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!