Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR)

Construction projects are often given serious attention at early stage, but less emphasize on the Defect Liability Period (DLP). Most parties consider the defect liability period are things that are not important and does not affect the overall performance of the project. Defect liability period (DL...

全面介紹

Saved in:
書目詳細資料
主要作者: Fait Hanapi
格式: thesis
語言:eng
出版: 2015
主題:
在線閱讀:https://ir.upsi.edu.my/detailsg.php?det=1271
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
id oai:ir.upsi.edu.my:1271
record_format uketd_dc
spelling oai:ir.upsi.edu.my:12712020-02-27 Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR) 2015 Fait Hanapi LB2300 Higher Education Construction projects are often given serious attention at early stage, but less emphasize on the Defect Liability Period (DLP). Most parties consider the defect liability period are things that are not important and does not affect the overall performance of the project. Defect liability period (DLP) that has been provided in the contract completely and clearly enough how it is governed. The weakness in the governing DLP will give negative impact on the users of the building and would be detrimental to t 2015 thesis https://ir.upsi.edu.my/detailsg.php?det=1271 https://ir.upsi.edu.my/detailsg.php?det=1271 text eng closedAccess Masters Universiti Pendidikan Sultan Idris Fakulti Sains Kemanusiaan N/A
institution Universiti Pendidikan Sultan Idris
collection UPSI Digital Repository
language eng
topic LB2300 Higher Education
spellingShingle LB2300 Higher Education
Fait Hanapi
Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR)
description Construction projects are often given serious attention at early stage, but less emphasize on the Defect Liability Period (DLP). Most parties consider the defect liability period are things that are not important and does not affect the overall performance of the project. Defect liability period (DLP) that has been provided in the contract completely and clearly enough how it is governed. The weakness in the governing DLP will give negative impact on the users of the building and would be detrimental to t
format thesis
qualification_name
qualification_level Master's degree
author Fait Hanapi
author_facet Fait Hanapi
author_sort Fait Hanapi
title Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR)
title_short Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR)
title_full Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR)
title_fullStr Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR)
title_full_unstemmed Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR)
title_sort defect liability period in the construction contract: lessons learnt from an institution of higher education (iohe) building project (ir)
granting_institution Universiti Pendidikan Sultan Idris
granting_department Fakulti Sains Kemanusiaan
publishDate 2015
url https://ir.upsi.edu.my/detailsg.php?det=1271
_version_ 1747832962589655040