Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR)
Construction projects are often given serious attention at early stage, but less emphasize on the Defect Liability Period (DLP). Most parties consider the defect liability period are things that are not important and does not affect the overall performance of the project. Defect liability period (DL...
محفوظ في:
المؤلف الرئيسي: | Fait Hanapi |
---|---|
التنسيق: | thesis |
اللغة: | eng |
منشور في: |
2015
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ir.upsi.edu.my/detailsg.php?det=1271 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Leveraging on lesson learnt in Jabatan Kerja Raya project management
بواسطة: Hamzah, Ramlan
منشور في: (2011) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
بواسطة: Lim, Tze Shwan
منشور في: (2011) -
Occurrences of building defects during defects liability periods of low-cost housing projects / Addruse Hassan
بواسطة: Hassan, Addruse
منشور في: (2006) -
Contractor's liability relating to defective works that are discovered after the defects liability period
بواسطة: Leong, Mei Wan
منشور في: (2010) -
Law and governance of waqf in selected higher education institutions (HEIs) in Malaysia: lessons learnt from Turkey / Rohayati Hussin
بواسطة: Hussin, Rohayati
منشور في: (2020)