Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR)
Construction projects are often given serious attention at early stage, but less emphasize on the Defect Liability Period (DLP). Most parties consider the defect liability period are things that are not important and does not affect the overall performance of the project. Defect liability period (DL...
Saved in:
主要作者: | Fait Hanapi |
---|---|
格式: | thesis |
語言: | eng |
出版: |
2015
|
主題: | |
在線閱讀: | https://ir.upsi.edu.my/detailsg.php?det=1271 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Leveraging on lesson learnt in Jabatan Kerja Raya project management
由: Hamzah, Ramlan
出版: (2011) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
由: Lim, Tze Shwan
出版: (2011) -
Occurrences of building defects during defects liability periods of low-cost housing projects / Addruse Hassan
由: Hassan, Addruse
出版: (2006) -
Contractor's liability relating to defective works that are discovered after the defects liability period
由: Leong, Mei Wan
出版: (2010) -
Law and governance of waqf in selected higher education institutions (HEIs) in Malaysia: lessons learnt from Turkey / Rohayati Hussin
由: Hussin, Rohayati
出版: (2020)