Financial feasibility study on the construction of Changi Airport Terminal 3 using build-operate-transfer (BOT) financing scheme /
Saved in:
主要作者: | Ramanathan Ramanathan |
---|---|
格式: | Thesis 图书 |
语言: | English |
出版: |
1995
|
主题: | |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Cost control of Terminal II construction : Changi Airport /
由: Tsang, Alan Chi Kin
出版: (1991) -
The economic of airport development and control /
由: Fitzgerald, E. V. K. 1947-
出版: (1973) -
Retrofitting of airport terminal buildings /
由: Han, Edward Fung Siew
出版: (1994) -
Maintenance and operation of Baggage Handling System (BHS) and Terminal Transit System (TTS) at KLIA airport / Khairul Anuar Razali
由: Razali, Khairul Anuar
出版: (2007) -
Developing critical success factors (CSFs) of value management (VM) workshop for the Malaysia Airports Holdings Berhad (MAHB) / Syamsul Azuar Arshad
由: Arshad, Syamsul Azuar
出版: (2022)