Soft ground improvement by prefabricated vertical drain (pvd)
Soft soil improvement in the project requires the consideration of the preloading programme. This method long track record of success and may be a unexpected time delay. Then one of the solutions is to use surcharge that fill must extend horizontally at certain depth beyond the perimeter of the plan...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2018
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/81532/1/NorAisahKhalidMSKA2018.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|