Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor
Overflow risk of detention pond is defined as the probability of having a rainfall event that produces a runoff volume more than the available storage capacity of detention pond. Overflow risk analysis depends on the waiting period (elapse time) and draining time. This study dealt with risk analysis...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2008
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/9863/1/ZulizianaSuifMFKM2008.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
成为第一个发表评论!