Improving substructure works safety performance rating using six sigma methodology
the occupational accident rate is one of the highest across all other industrial sectors. Low safety performance can possibly contribute to occupational accident. The Solaris 1 construction project site monthly safety performance ratings were below the target 70% set by the client. This research use...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | eng eng eng |
出版: |
2022
|
主题: | |
在线阅读: | https://etd.uum.edu.my/10085/1/depositpermission-not%20allow_s823284.pdf https://etd.uum.edu.my/10085/2/s823284_01.pdf https://etd.uum.edu.my/10085/3/s823284_02.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|